Keybridge

Details

Client: H&MV Engineering/Mount Anvil
Services: 3 Sub-stations & LV Distribution
Year: 2019-20

Ventilating Substations

We utilized Firemac FM Blue, for our Keybridge House project. With 3 basement substations being fed from a UKPN primary, also within the building, We were required to provide a 60-minute cable circuit integrity for the HV feeder cables. We also needed to provide a combined ventilation and blast duct system for 2 of the substations in the event of a fault.

HPS and Firemac provided the cable solution in a custom built and designed trunking system. The cables were run into FM Blue trunking, internally lined with Rockwool, and sealed from substation to substation. This was teed off into a Temporary Building Supply (TBS) substation whilst remaining fully protected, and a combined install length of 350 meters!

The first two substations required ventilation to the ground floor as they contained transformers and so needed ventilation and a blast path if there were to be a major fault. The cross-sectional areas were calculated by Firemac to allow for the airflow and pressure relief.

Let's connect

Connect with us to discuss your electricity connection requirements.
Call us, send us an email enquiry or fill out the form below.

Call Us

01604 217813